How fast can you cover the New York City subway?

The 472 Project is planning and testing a route through the entire system. We’re studying what happens when trains run late, transfers take longer than expected, and the next move has to change.

See how it works

One missed train changes the route

Illustrative scenario

Planned and alternate routes to 14 St–Union SqTake the 42 St Shuttle from Grand Central–42 St to Times Sq–42 St. The planned Q connection to 14 St–Union Sq is missed. The alternate takes the downtown 1 to 14 St and connects to the eastbound L at 6 Av for Union Square.Grand Central42 StTimes Sq42 StUnion Sq14 St14 St / 6 AvShuttleMissed QAlternate route

The challenge

What counts as a visit?

The first practice route counts each required station complex as one stop to cover. A complex can group several connected stations. The practice rules say which events count, such as getting off the train or, where allowed, stopping at a platform while still on board.

How it works

  1. Plan the route

    Start with the timetable, public walking paths, and the list of required visits. In the example, the runner takes the 42 St Shuttle from Grand Central–42 St to Times Sq–42 St, then plans to take a downtown Q to 14 St–Union Sq.

  2. Test disruptions

    If the runner misses the Q, they could take a downtown 1 to 14 St, then transfer to an eastbound L at 6 Av for Union Square. The experiment compares choices using the information available at the time, then measures missed connections, completed visits, and finish times across scenarios.

  3. Verify the visits

    A separate checker follows the itinerary step by step. It checks that the trains and transfers are possible under the selected timetable and rules, then works out which complexes the itinerary covers.

Progress

Working toward a verified route

The first full-network milestone is a practice itinerary that covers every required complex on one operating day. A verified timetable route will give us something to compare against when we start testing disruptions.

The sample job matched on Mac and Linux CI

The command line and local API produced matching results from the same synthetic test data. The next step toward a real route is to assemble a station inventory and timetable for a specific operating day.

Common questions

What if a station is closed?

If the closure makes a required visit impossible, the route report should show which objective it couldn’t reach and why. Only a change to the practice rules can take a required stop off the list.

Can the route use any transfer?

The planner can use public paths allowed by the practice rules. A transfer needs enough time to walk between platforms or stations and board the next train.

Does a simulated run count as a record?

A simulation estimates how a route might hold up. An official attempt would need to follow the organizer’s written rules and document actual visits in the required format.